PIPE-CO Locations and Contacts NORTH AUSTIN Corporate Office 1421 Wells Branch Pkwy. Ste. 110 Pflugerville, TX 78660 DALLAS / FORT WORTH 701 E Plano Pkwy Ste. 305 Plano, TX 75074 Arnvill 1540 N Newport Road Arnvill, CO 80916, USA +1 719.566.5821 Paris Lane Drive 75001 Paris, France +1 555.717.1808 Pipe-Co Examples-Case Studies

Astoria Water Plant Facility- Pipe-Co developed, engineered and installed the 800K sqft plant located in Boulder City, Nevada. Starting in 2019 this facility was the first to utilize dual producing filtration and agitation pumps. Developed in 5 stages, the final stage 5 was officially activated in March 2022.

Northwest Gas Exchange Project- The Northwest Gas Exchange Project is a 250 megawatt (MWAC) Gas power plant near the city of Blythe in Riverside County, California. It occupies about 2,300 acres of mostly public land in the Mojave Desert. The construction uses Bilateral Pipes and Fabricated Joints developed by Pipe-Co. The output is being sold to Southern California Edison under a power purchase agreement.

SeaPort Oil and Gas Project- The SeaPort Project is a 320K Gallon Flow Natural Gas transfer station located about 5 miles north of the town of Milford in Beaver County, Utah. The project was developed by Pipe-Co, built by SM Construction, and commissioned in September 2018. The product is being transferred under three separate 20-year power purchase agreements to Mountain West Power which serves customers in Utah, Idaho, and Montana.

Yukan water Plant The Vauxhall Solar Farm is a 60K treatment facility, located on approximately 940 acres of government land in Alaska. The project is estimated to offset 70,000 tons of wastewater annually. The total capital cost of the project is expected to exceed $90 million, bringing an important source of direct and indirect economic activity to the state of Alaska. The project is expected to be completed in one phase with commercial operations commencing in 2023 and continuing over the next 30 years and beyond.

Uganda Natural Gas The UNG is a 500K liter transport facility, located on approximately 940 acres of government land in Africa. This site uses several extraction and processing methods developed by Pipe-Co's research division. Future sites are expected to adopt these methods to increase the efficiency of gas exchange and transport.

Tel Aviv Oil and Gas Plant The Tel Aviv Plant was started in 2020 to provide a central facility for the region’s natural resources to be transported, filtered and processes. This facility is one of 4 in the middle east and provides millions of liters of processed fuels to surrounding countries. In 2022 the facility went online and is currently operating at 100% operating conditions.